|
Dec 21, 2024
|
|
|
|
CM 2012 Plan and Cost Analysis for Residential Construction (3) Prereq.: CM 1010 and MATH 1550 with a “C” grade or better. 2 hrs. lecture; 2 hrs. lab. Interpretation of working drawings and specifications; cost estimation; bidding; materials, methods and equipment for residential construction.
Add to Portfolio (opens a new window)
|
|